Primary Navigation

Land Development

Downloads for Land Developers

The following documents are applicable to all Land Development Applications:

Conditions of Connections

Potable Water Conditions of Connection [DOC 72kb]
Recycled Water Conditions of Connection [PDF 26kb]
Sewerage Conditions of Connection [DOC 66kb]
Pressure Sewers (Commercial or Industrial) Conditions of Connection [DOC 70kb]
Pressure Sewer System Drawing 1 [PDF 115kb]
Pressure Sewer System Drawing 2 [PDF 145kb]
Pressure Sewer System Drawing 3 [PDF 123kb]

Approved Products

Products not listed in City West Water Products Catalogues are not allowed for use in City West Water licensed areas. Use of alternative products may seriously affect the long term performance of the infrastructure system.

What's the Latest with the City West Water Products Catalogue?

If you have any queries, or suspect that a product has been authorised but has yet to be included in the Catalogue, please inform City West Water’s Standards & Design Section. For any problems with a product or for information on how to get product authorisation please contact City West Water Standards & Design Section at 9313 8592 or standards@citywestwater.com.au

Approved Products - Gravity Sewer [PDF 588KB] 
Approved Products - Pre-mixed Concrete and Quarry Products Catalogue [PDF 140KB]
Products Catalogue for Pressure Pipeline Systems [2.2MB]
Sewerage Pumping Stations Systems Products Catalogue [PDF 364KB]

Fact Sheets

Fact Sheet - Complex Plumbing Fees 2008 [PDF 41KB]
Fact Sheet - CWW Developer Glossary [PDF 22KB]
Fact Sheet - Land Development Fees 2008 [PDF 36KB]
Fact Sheet - New Price Rises 2008 Summary [PDF 18KB]

Maps

Map - Sewer Contribution Zones [PDF 1.2MB]
Map - Water Contribution Zones [PDF 1.2MB]


All Land Development applications received by City West Water from 14 April 2008 will be subject to the introduction of the consultant/contractor accreditation model (Development Deed).

In this respect, the following documentation will be applicable for these applications:

Manuals

Land Development Manual 

Development Deed Documents

Development Deed Instrument
Schedule 1 – Development Deed Standard Conditions
Schedule 2 - Reference Schedule
Schedule 7 – Approved Unconditional Undertaking
Schedule 8 - Novation Deed

Applications

Non-works Application 2008
Development Works Applications

Verification Forms

Verification Form – Design
Verification Form – Pre-construction
Verification Form – Construction
Verification Form – As-constructed
Verification Form – End of Defects
Verification Form – Pump Station Design
Verification Form – Pump Station Pre-construction
Verification Form – Pump Station Construction
Verification Form – Pump Station – End of Defects
Verification Form – Attachment Sheet

Notifications

Water Main Shutdown Request
Notification of Testing
Notification of Confined Space Entry

Approved Suppliers

Accredited Consultant List
Accredited Contractor List

With the exception of the Land Development Manual, Schedule 1 - Development Deed Standard Conditions, Acredited Consultants and Contractor's Lists, all of the above forms are available in Word format on request. Please contact the Land and Property Development Team on 03 9313 8702 if you would like to request these.

The following Forms and Manuals are only applicable for Land Development applications received by City West Water prior to 14 April 2008:

Forms

Application Form - Non-Works Offer 2007 [PDF 37KB]
Form - Application for Requirements Specification (works) [PDF 37KB]
Form - Construction Verification 2006 [PDF 47KB]
Form - Notification of Entry to Confined Spaces [DOC 67KB]
Form - Design Verification Form [PDF 30KB]
Form - Acceptance of Digital As-constructed Information Verification Form [PDF 29KB]
Form - End of Defects Liability Period Verification Form [PDF 31KB]
Form - Acceptance of Non-digital As-contructed Information Verification Form [PDF 29KB]
Form - Offer Acceptance Form 2006 [PDF 44KB]
Form - Pre-construction Verification Form [PDF 34KB]
Form - Notification of Under Pressure Cut-in Connection (UPCIC) Method or Request for Shutdown of Water Mains for New Connection - Sep 07 [DOC 1MB]
Form - Notification of Intention to Carry Out Testing - Sep 07 [DOC 311KB]
Form - Verification Form Attachment Sheet [PDF 19KB]

Manuals

Developer Policy Pricing Manual 2007 - 2008 [PDF 111KB]
Manual - CWW Property Development Quality Assurance Requirements Manual [PDF 66KB]
Standard Conditions for Agreement Works 2006 [PDF 129KB]